Power transformer assembly line overhead crane system
Power transformer assembly line overhead crane system

Power transformer assembly line overhead crane system

  • Tel.: +86-373-3020116
  • Mobile:+86-15737316938
  • Fax: +86-373-3020456
  • E-mail:yolanda@perfte.com
Leave Messages

Overhead crane system is a general bridge crane applied to lifting or transporting workpieces in workshop or between workshops.     
The power transformer overhead crane is travelling on the rails along the workshop. The crane trolley works along the main gorders, and the lifting hook goes up-down. The three parts workshop together to finish the transforting works.

 
Overhead crane system
Overhead crane
crane system
 


Stock bin, warehouse
Power transformer or generator plant
Maintenance factory
Pipeline or assembly line]
Casting steel workshop
Rail wheel processing plant
Widely application, the temperature can from -20°C to +40°C
Wide span range from 7.5m to 32.5m
Steady, security and effciency
Strength box girder, durable to use
Large lifting capacity, can reach to 300t

Capacity

T

10

16t/3t

5t/20t

32t/5t

50t/100t

Operational method

 

Cabin control

Speed

Main hook Lifting

A5

m/min

8.5

7.9

7.2

7.5

5.9

A6

13.3

13

12.3

9.5

7.8

Aux. hook Lifting

 

16.7

19.5

19.5

13.2

Cross travelling

43.8

44.6

44.6

42.4

38.5

Long travelling

A5

 

90.7/91.9/84.7

84.7/87.6

84.7/87.6

87/74.2

74.6/85.9

A6

115.6/116.8/112.5

112.5/101.4

112.5/101.4

101.4/101.8

86.8/87.3

Max. Lifting height

Main hook

m

16

16

12

16

12

Aux. hook

 

18

14

18

16

Working duty

 

A5 ,A6

Power supply

 

380V 60HZ 3phase AC

Span

m

10.5-31.

Recommend rail

 

43kg/m

43kg/m or QU70

QU80

QU70


Get Price And Support

Please Feel free to give your inquiry in the form below. We will reply you in 24 hours